The Need
Rework, and particularly field rework, continues to be one of the most major sources of unplanned cost growth on industrial construction projects. According to CII (Construction Industry Institute) research, if field rework alone can be significantly reduced, or even eliminated, as much as 10% of overall project costs can be saved. The savings are expected to be substantially greater across an entire project having engineering and procurement.
Field rework is not caused solely by construction site activities in isolation. Far from it. In order for the field rework to be reduced, a substantial effort must be made to improve the effectiveness of the prior project phases with a view to preventing the all to frequent ‘catch-up’ during the site construction and commissioning phases.
To combat project-wide rework, the COAA has developed PRRTTM – Project Rework Reduction Tool. It is an innovative and interactive Project Management software tool for enhanced leadership, accountability and the implementation of proven Industry Best Practices for Industrial EPC Projects.
PRRTTM was designed to engage ALL project participants and stakeholders. Implemented as early as possible in a project’s timeline, it promises to consistently improve the likelihood of project success through the elimination of rework at all phases in a of projects development. It can be applied to all Process Industry EPC projects, irrespective of size and location.
The Technology
Identifying/ Predicting Problems
PRRTTM is an easy-to-use and practical software tool designed to assist project managers, their teams, and other stakeholders perform regular ‘health checks’ of their industrial projects.
Disasters in project execution can so often be averted early on by an honest evaluation and recognition that deficiencies exist in the design effort and project execution plan. PRRTTM makes this evaluation process easy.
PRRTTM employs easy-to-use questionnaires (see right) in five project phases to rate performance against known factors causing rework. The resultant ratings are interpreted within the five COAA-defined Primary Rework Cause Sections, as given by the Rework Cause Classification Diagram (see right). The phase evaluation or, rating exercise, derives a Project Rework Reduction Index, or PRRI, for each phase review. A sound project will have a high rating. Trending graphs are available to follow performance through the principal project phases.
PRRI’s high-impact graphics comprise:
- PRRI Tile Chart (see right)
- PRRI Dashboard Chart
- PRRI Dashboard Element (see right)
- PRRI Priority Dashboard
- PRRI Trend Graph
- PRRI Detailed Trend Graph (see right)
The 3 principal charts illustrated on the right are ideal for presentations and reports, having been crafted to focus attention where it's most needed. They can be readily copied into all MS applications. Scorecards are also made available to analyze the questions, responses and weighting.
PRRTTM saves the accumulating data from successive phase reviews in a single project file. There is no limit to the number of projects that can be managed with PRRTTM.
Searching for Solutions
Appreciation as to where deficiencies exist is but the first important step toward solutions. Once less-than-optimum performance is predicted in any of the Rework Cause Sections and subcategories, the user can proceed into the Definitions and Suggestions area (see right) of PRRTTM, see right, to seek practical solutions. Found there are extensive Ideas & Industry Best Practices that are the result of extensive experience contributed from the COAA membership as well as published sources, particularly The Construction Industries Institute (CII). Applied appropriately, these will lead to substantial improvements in future PRRI ratings and hence improved project execution performance.
Comprehensive Resource Documents (see right) also easy-to-use checklists and templates are available within this suggestions area.
The Benefits
PRRTTM sets out to complement traditional and common project controls, and much more. It focuses on those ‘softer’ management issues that often go unnoticed or ignored until it’s too late. Most project controls tools are reactive, but PRRTTM can predict and mitigate rework issues BEFORE they impact project schedule and the ‘bottom line.’ PRRTTM has been developed to address the simple premise that disasters in industrial project execution can be mitigated early on by honest detection, evaluation and mitigation of deficiencies in the design & project plans.
PRRTTM will aid veteran and inexperienced project teams alike, regardless of project size, though mega-projects may require more criteria due to their complexity. One of the tool’s key attributes is the ability to benchmark projects during their development phases. PRRTTM can also be used to track a projects PRRI indices over time, as well as to undertake Project Performance Audits. Finally, the Definitions and Suggestions area is an essential training tool for project team members, whether owner, engineer or contractor.
Other important features of PRRTTM include a library and a bookshop, as well as a section with links to websites of global institutions and publications that offer additional specific resources, often for free. User friendliness of the software was a principal development criterion and comprehensive user instructions are provided.
Status
PRRTTM originates from an initiative of the Rework Reduction Subcommittee of the COAA, the Construction Owners Association of Alberta (http://www.coaa.ab.ca) COAA is already renowned in Canada for its highly successful initiatives in Industrial Safety and Workforce Development. PRRTTM has evolved over three years of unpaid COAA subcommittee volunteer work.
PRRTTM , in its current form, has been made available for free to COAA members. Most of the 470 attendees of the COAA May 2003 Conference received a copy of the CD Rom. PRRTTM is also available for free web download, and there have been well over 1200 downloads to date. Currently, Suncor Energy Inc. and Colt Engineering Corporation are applying PRRTTM successfully on their major projects. SNC Lavalin and Petro-Canada, to name but two other major corporations, are in the throws of engaging PRRTTM to assist with their projects. Feedback from Suncor Energy and Colt has been extremely positive and gratifying.
With future development and commercialization, it is intended to develop PRRTTM into a world-class product by enhancing the software’s’ already well-developed features. PRRTTM may be readily crafted to suit the more specific needs of any other field of engineering construction: e.g. civil, commercial and offshore etc.
Barriers
Present PRRTTM is developed for the industrial construction projects. Even though there are many general categories applicable to other types of projects, it may not appropriate to use PRRTTM on every construction projects. In addition, the user who inputs data in this program and develops index for his/her own project is required to have experience and overall knowledge on the project since PRRTTM requests the user to provide subjective answers to several questions.
Points of Contact
- Ken East, Business Development Manager, Horton CBI Ltd. #3500, 205 5th Ave SW, Calgary, Alberta T2P 2V7, CANADA. Phone: (403)-264-1333 Fax: (403)-266-2453 Email: eastkr@yahoo.com
- Construction Owners Association of Alberta (COAA), Suite 2302 Oxford Tower, 10235 - 101 Street, Edmonton, Alberta T5J 3G1. Phone: (780) 420-1145 Fax: (780) 425-4623 Website: http://www.coaa.ab.ca
Refrences
- COAA (Construction Owners Association of Alberta) Web site http://www.coaa.ab.ca (Aug. 13, 2003)
- PRRT Software v2.0 (Free download at http://www.coaa.ab.ca/BESTPRACTICES/Rework/ProjectReworkReductionTool/tabid/92/Default.aspx)